| PINE
STREET INN TOWER, BOSTON, MA |
160
foot high brick tower. Presented a paper to the North
American Masonry Society on our repair work. |
| MANCHESTER
CONGREGATIONAL CHURCH, MANCHESTER, MA |
200
year old Church. Removed steeple, repaired it and replaced
it. |
| SOUTH
WALPOLE METHODIST CHURCH, SOUTH WALPOLE, MA |
Repaired
steeple and provided new steel trusses to support back
of tower. |
| WINCHESTER
TOWN HALL, WINCHESTER, MA |
Investigated
120 foot high brick tower. |
| CRAWFORD
MEMORIAL UNITED METHODIST CHURCH, WINCHESTER, MA |
Repaired
steeple and stopped water leaks. |
| ACTON
CONGREGATIONAL CHURCH, ACTON, MA |
Extensive
renovation to church. |
| HOLYHOOD
CEMETERY CHAPEL, BROOKLINE, MA |
Investigated
and provided drawings for repair of stone steeple. |
| CHRIST
CHURCH LONGWOOD, BROOKLINE, MA |
Investigated
stability of existing bells supports. |
| PERKINS
SCHOOL FOR THE BLIND, BELL TOWER, WATERTOWN, MA |
Provided
plans to repair top of the 160 foot high bell tower damaged
by wind. |
| SAINT
JOHN'S CHURCH, HOPKINTON, MA |
Repaired
stone steeple and stopped water leaks |
| IPSWICH
METHODIST CHURCH, IPSWICH, MA |
New
steeple to match old steeple destroyed 20 years ago for
cellular antennas. |