 |
CRAWFORD MEMORIAL UNITED METHODIST CHURCH, WINCHESTER,
MA
Repaired steeple and stopped water leaks. |
| |
PARTIAL LIST OF STEEPLES AND TOWERS
PINE STREET INN TOWER, BOSTON, MA
160 foot high brick tower. Presented a paper to the North American
Masonry Society on our repair work.
MANCHESTER CONGREGATIONAL CHURCH, MANCHESTER, MA
200 year old Church. Removed steeple, repaired it and replaced it.
SOUTH WALPOLE METHODIST CHURCH, SOUTH WALPOLE, MA
Repaired steeple and provided new steel trusses to support back
of tower.
WINCHESTER TOWN HALL, WINCHESTER, MA
Investigated 120 foot high brick tower.
ACTON CONGREGATIONAL CHURCH, ACTON, MA
Extensive renovation to church.
HOLYHOOD CEMETERY CHAPEL, BROOKLINE, MA
Investigated and provided drawings for repair of stone steeple.
CHRIST CHURCH LONGWOOD, BROOKLINE, MA
Investigated stability of existing bells supports.
PERKINS SCHOOL FOR THE BLIND, BELL TOWER, WATERTOWN, MA
Provided plans to repair top of the 160 foot high bell tower damaged
by wind.
SAINT JOHN'S CHURCH, HOPKINTON, MA
Repaired stone steeple and stopped water leaks.
IPSWICH METHODIST CHURCH, IPSWICH, MA
New steeple to match old steeple destroyed 20 years ago for cellular
antennas.
|